Embedded System Design
Project Internship Program

Duration – 5 / 15 Weeks
Project Training – Offline / Online – 2 or 4 WEEKS
Project Development – Offline/ Online – 4 or 6 or 8 WEEKS

Intermediate

Program Highlights:

  • Fundamentals of C programming: Understand data
    types, operators, and control flow
  • Advanced C programming: Learn about arrays,
    pointers, structures, and preprocessor directives
  • Embedded systems with ARM CortexM3 architecture
    Practical exposure and learning
  • Peripheral interfacing: Implement interfaces like
    timers, interrupts, ADC, UART, SPI, and I2C

Tools & Resources:

  • Linux OS: Ubuntu
  • Compilers: gcc 4.8 and above
  • Development Tools: Keil Micro Vision, Flash Magic 
  • Hardware: LPC1768 Development Board. 

Sample Project Titles:

  • Accident Alert and Vehicle Tracking System using LPC1768 Microcontroller
  • Bluetooth remote home automation system using LPC1768 Microcontroller
  • Controlling Electrical Appliances through Zigbee Technology using LPC1768 Microcontroller
  • Gas Leakage Detection and Monitoring system using LPC1768 Microcontroller
  • Smart Sensors Based Monitoring System for Agriculture using ARM7 LPC1768 Microcontroller
  • Alcohol Detection with Vehicle Controlling and GSM based alert system using LPC1768 Microcontroller
  • Automatic Toll Gate Management and Vehicle Access Intelligent Control System Based onLPC1768 Microcontroller

Program Outcome:

  • Ability to write efficient , readable and maintainable Embedded Code
  • Proficiency in debugging C programs for Embedded Systems
  • Hands-on experience in programming the LPC1768 microcontroller with Keil IDE
  • Ability to interface with various peripherals (LEDs, timers, ADC, etc.)
  • Ability to develop System Design for Embedded Applications
  • A deep understanding of embedded system architecture and communication protocols

Course Curriculum

Project Phase-1: Research, Planning, and Initial
Development

  • Project Scope Definition
  • Research & Feasibility Study
  • Initial Planning & Setup
  • Early Prototyping or Conceptual
    Design

Phase-2: Development, Testing, and Refinement

  • Development & Iteration
  • Testing and Validation
  • Refinement & Optimization
  • Prepare for Final Deliverables
  • Final Project Demo and Presentation
  • Final Presentation

Enquire Now

Enquire Now

Enquire Now

Please Sign Up to Download

Please Sign Up to Download

Enquire Now

Please Sign Up to Download

Enquiry Form